No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi |
---|---|---|---|---|
1 | Pilar Teknotama Sinergi | 83.247.383.9-541.000 | ||
2 | PT Mahapatih Sibernusa Teknologi | 84.058.037.7-029.000 | ||
3 | Sistem Fisik Siber | 86.380.049.6-801.000 | ||
4 | PT. Indonesia Super Corridor | 02.699.198.4-014.000 | ||
5 | PT. PHINTRACO TECHNOLOGY | 02.751.897.6-062.000 | ||
6 | PT. IMT MITRA SOLUSI | 02.203.797.2-429.000 | ||
7 | PT. MIRANTHI KONSULTAN PERMAI | 01.210.739.7-424.000 | ||
8 | PT. GEO SPACE INTIMATIKA | 02.144.901.2-001.000 | ||
9 | PT. WAHANA REKA TEKINDO | 01.572.337.2-014.000 | ||
10 | CV. ASTAMA Billitone Engineering | 90.226.161.9-305.000 | ||
11 | PT. Labalaba Citra Inovasi | 02.648.871.8-411.000 | ||
12 | PT. DAS MAP INDONESIA | 83.820.063.2-017.000 | ||
13 | PT. GLOBAL TEKNO TRITAMA | 03.172.144.2-006.000 |